ADNOC Logo

Abu Dhabi National Oil Company

Petroleum Ports Authority
  • Home
  • About PPA

    The vision of the Petroleum Ports Authority is to attain a leading regulatory role, and develop and maintain world class infrastructure while promoting sustainable efficiency and excellence.

    About PPA

    • WHO WE ARE
    • Mission Statement
    • Organizational Structure
    • FAQs
  • Marine Notices

    Local marine notices and marine circulars issued and enforced by the PPA can be found here.

    Marine Notices

    • Local Marine Notices - Das Zirku and Mubarraz Ports
    • Local Marine Notices - Jebel Dhanna Ruwais Port
    • Marine Circulars DAS Island
    • Marine Circulars HQ
    • Marine Circulars Ruwais
  • Ship Vetting

    Our established vetting process ensures that all vessels operating in our ports conform to the highest international standards. This secures the safe carriage of ADNOC Group cargoes and minimizes risk.

    Ship Vetting

    • Why we vet
    • ADNOC SIRE Inspection
    • SHIP VETTING POLICY STATEMENT
    • ADNOC ship vetting standard
    • Useful Links
    • Vetting FAQS
    • Contact ADNOC Vetting
  • Ports

    All vessels visiting the Petroleum Ports must comply with Port Regulations. Users may download the necessary Forms and Port Information . Details of our state of the art Vessel Traffic Information System are available here.

    Ports

    • Petroleum Ports Authority Port Regulations
    • Jebel Dhanna Ruwais
    • Das Zirku and Mubarraz Ports
    • STANDARDS FOR MANAGEMENT OF HARBORS WHARVES AND PIERS
    • Port tariffs, charges and dues
    • VTIS

    We operate both Offshore and Onshore Petroleum Ports.

    Jebel Dhanna Ruwais Port is located onshore approximately 240 kms. West of Abu Dhabi City.

    Das Zirku and Mubarraz Ports are located between 55 and 90 Nautical Miles offshore.

  • Forms and Downloads
  • News
  • Contact Us
  • Search

Content of this document might become obsolete after printed date 05/9/2025 12:02:36 PM

Abu Dhabi National Oil Company Petroleum Ports Authority

  1. Home
  2. Ports
  3. Das Zirku and Mubarraz Ports
  4. Das Passage Plans - For Guidance Only
Print Page
  • LIST OF ABBREVIATIONS
  • PART I | 1 - FOREWORD
  • PART I | 2 - CONTACT INFORMATION AND REGULATIONS
  • PART II | 3 - ARRIVAL AND DEPARTURE
  • PART II | 4 - NOTIFICATION
  • PART II | 5 - DOCUMENTATION
  • PART II | 6 - REPORTING
  • PART III | 7 - PORT DESCRIPTION
  • PART III | 8 - PORT NAVIGATION
  • PART IV | 9 - PORT SAFETY
  • PART IV | 10 - PORT SECURITY
  • PART V | 11 - NAUTICAL SERVICES
  • PART V | 12 - NAUTICAL COMMUNICATION
  • PART VI | 13 - CARGO OPERATIONS
  • PART VI | 14 - VESSEL OPERATIONS
  • PART VI | 15 - PORT INSPECTIONS
  • PART VI | 16 - PORT SERVICES
  • Das Passage Plans - For Guidance Only

Das Passage Plans - For Guidance Only

1. Guidance Passage Plan Das Pilot Station to TB3 & TB6

Download

2. Guidance Passage Plan Das Pilot Station to Jetty No. 4&5

Download

3. Guidance Passage Plan Zirku Pilot Stn to SPM (A-B & C)

Download

4.A. Guidance Passage Plan Mubarazz Pilot Stn to SPM-Part 1

Download

4.B. Guidance Passage Plan Mubarazz Pilot Stn to SPM- Part 2

Download
62
37
2888 
About PPA
  • Who We Are
  • Mission Statement
  • Organizational Structure
  • FAQs
Marine Notices
  • Local marine notice das island
  • Jebel Dhanna Ruwais Port
  • Marine circulars DAS ISLAND
  • Marine circulars HQ
  • Marine circulars Ruwais
Ship Vetting
  • Why We Vet
  • SHIP VETTING POLICY STATEMENT
  • ADNOC SHIP VETTING STANDARDS
  • Useful Links
  • Vetting FAQS
  • Contact ADNOC Vetting
Ports
  • Petroleum Ports Authority Port Regulations
  • Jebel Dhanna Ruwais
  • Das Zirku and Mubarraz Ports
  • Port tariffs, charges and dues
  • VTIS
Forms and Downloads
  • Forms and Downloads
  • News
© Copyright 2025 Abu Dhabi National Oil Company (ADNOC) - All Rights Reserved

Content of this document might become obsolete after printed date