Das Zirku and Mubarraz Ports

YEAR: 2018

Port Marine Notice 031-2018 : List of active Marine Notices as of 02.07.2018

Download

Port Marine Notice 030-2018 : Diving Operation by CCC Maritime 1-Bu Haseer Field

Download

Port Marine Notice 028-2018 : SARB SPM Hose re installation in position Lat 25 ° 04.00' N Long 053 ° 00.73' E

Download

Port Marine Notice 027-2018 : AS-Built ROV survey of the newly laid 16" MOL from Das Island to NASR Field

Download

Memorandum 001-2018 : Summer Midday Break Decree

Download

Port Marine Notice 024-2018 : Bathymetric Survey

Download

Port Marine Notice 023-2018 : Flare Tip Removal and Re- Installation at ZFP1 & ZPF2.

Download

Port Marine Notice 022-2018 : Post Construction Anchor clearance survey

Download

Port Marine Notice 013-2018 : Mooring buoy deployed west of Das Island

Download

Port Marine Notice 008-2018 : ZIRKU Island Communications Channels & Frequency

Download

YEAR: 2017

Port Marine Notice 057-2017 : Navigational Buoy Deployed

Download
======================================= 44 / 2017 ============================================-->

Port Marine Notice 044-2017 : Removal of Navigational buoys.

Download

Port Marine Notice 041-2017 : Installation of Steel Sleepers and Grout bags.

Download

Port Marine Notice 038-2017 : Rig Al Shweihat stationed at Bu Haseer Oil Field.

Download

Port Marine Notice 037-2017 : IGD Temporary Jetty - Unsafe for berthing

Download

Port Marine Notice 035-2017 : Tug Mooring Buoys

Download

Port Marine Notice 032-2017 : New Port Regulations & Port Information

Download

Port Marine Notice 014-2017 : Navigational Buoys redeployed

Download

 

YEAR: 2016

Port Marine Notice 006-2016 : NASR Full Field development Project(NSFFD)- Pipe laying 16” MOL from Das Island to NASR Field

Download

Port Marine Notice 005-2016 : Mooring Buoy

Download