Port Marine Notice 054-2017 : Subsea Cable Pull and cable laying operation from East Das tsland to BH-1

Download

Port Marine Notice 053-2017 : Pipeline 12" MOL as-laid survey from East of Das lsland to Bu Haseer (BH-1)

Download

Port Marine Notice 052-2017 : 132 Kv subsea cable through the conduit from East Das lsland to NASR Field

Download

Port Marine Notice 047-2017 : ZAQUM WEST BUOY - AIS.

Download

Port Marine Notice 044-2017 : Removal of Navigational buoys.

Download

Port Marine Notice 042-2017 : Shore pull & Pipe laying operation of 12 inch MOL with 16 inch conduit.

Download

Port Marine Notice 041-2017 : Installation of Steel Sleepers and Grout bags.

Download

Port Marine Notice 040-2017 : M/V Zakher Admiral Diving Operation. (AUT SCAN).

Download

Port Marine Notice 038-2017 : Rig Al Shweihat stationed at Bu Haseer Oil Field.

Download

Port Marine Notice 037-2017 : IGD Temporary Jetty - Unsafe for berthing

Download

Port Marine Notice 035-2017 : Tug Mooring Buoys

Download

Port Marine Notice 032-2017 : New Port Regulations & Port Information

Download

Port Marine Notice 029-2017 : Rig Key Singapore stationed at Bu Dana BD-02

Download

Port Marine Notice 023-2017 : Preset anchors located within port limit

Download

Port Marine Notice 021-2017 : Bu Haseer Field Development Project -Trenching Work on East Side of Das Island

Download

Port Marine Notice 014-2017 : Navigational Buoys redeployed

Download

 

YEAR: 2016

Port Marine Notice 007-2016 : HAIL Surface Field Development - Pipe laying operation from Mubaraz Island to Hail Island

Download

Port Marine Notice 006-2016 : NASR Full Field development Project(NSFFD)- Pipe laying 16” MOL from Das Island to NASR Field

Download

Port Marine Notice 005-2016 : Mooring Buoy

Download