Abu Dhabi National Oil Company Petroleum Ports Authority
Port Marine Notice 33-2023: Dredging Yas/Ruwais Channel – Yas Channel Open for navigation with 17m depth and Ruwais Channel closed for navigation traffic.
DownloadPort Marine Notice 32-2023: List of Marine Notices in force as on 05.12.2023
DownloadPort Marine Notice 23-2023: Dredging Yas Channel – Deployment of Non Navigational Buoys and AWAC device
DownloadPort Marine Notice 19-2023: Ruwais and Yas Channel Enhancement – (Phase 1 - Dredging Yas Channel)
DownloadPort Marine Notice 15-2023: Jabel Dhanna Channel Enhancement – Pre Bathymetry Survey
DownloadPort Marine Notice 41-2022: HAIL AND GHASHA ARTIFICIAL CONSTRUCTIONS PROJECT SURVEY
DownloadPort Marine Notice 38-2022: Yabr Channel - Change in Channel Layout and increase in the number of buoys/strong>
DownloadPort Marine Notice 36-2022: ODAS Buoy Deployed - North of Sir BaniYas Island.
DownloadPort Marine Notice 29-2022: Reef Buoy No.3 replaced with Temporary Buoy.
DownloadPort Marine Notice 28-2022: Lost Anchor's Obstructions
DownloadPort Marine Notice 08-2022: "NO GO AREA" - SBY Offshore Island Project / Channel Dredging & Turning Basin.
DownloadPort Marine Notice 44-2020: WHRP - Sea water 98 "GRV Outfall Pipe-Marker Buoy
DownloadPort Marine Notice 6-2019: ADNOC Refining (RRE) Sea Water Intake - Diving operation
Download