Jebel Dhanna Ruwais Port

Jebel Dhanna Ruwais Port - Marine Notices

YEAR: 2017

Port Marine Notice 014-2017: Repositioning of Navigational Buoy No. 13 - Ruwais Channal.

Download

Port Marine Notice 013-2017: GD-E (PHASE-1) 42" Offshore Pipeline Project - Installation of KP 38 deck using HLS-2000 Barge.

Download

Port Marine Notice 012-2017: IGD-E (PHASE-1) 42" Offshore Pipeline Project - Installation of KP 38 deck using HLS-2000 Barge.

Download

Port Marine Notice 011-2017: Bathymetric Survey of Routes, Channels, Anchorages and Basins within and leading to Petroleum ports

Download

Port Marine Notice 010-2017: Repositioning of Navigational Buoys YAS-1 and YAS-2

Download

Port Marine Notice 009-2017: Seabed Obstruction-Pipeline"Tie-In" Arrangement

Download

Port Marine Notice 008-2017: Bathymetric survey at Ruwais/ Yas / E Ghasha and Delma Band

Download

Port Marine Notice 006-2017: Revamped Port Regulations and Information Booklet

Download

Port Marine Notice 005-2017: Subsea Obstruction – Tie-in Arrangement

Download

Port Marine Notice 003-2017: Pipe laying Operation - IGD-E-42” offshore pipeline from Das Island to Ras Al Qil

Download

Port Marine Notice 002-2017: Channel Status- Jebel Dhanna Ruwais

Download

YEAR: 2016

Port Marine Notice 012-2016: WRECK located on seabed

Download

Port Marine Notice 030-2016 : Alternative Recommended Dalma Route

Download

Port Marine Notice 033-2016 : Commissioning of Ruwais LNG Terminal

Download

Port Marine Notice 037-2016 : Bulk Cargo Terminal (BCT) Channel Buoys change of light characteristics

Download

Port Marine Notice 041-2016 : CGG 3D SEISMIC SURVEY. Phase I - Completed & Phase II - Commenced

Download

Port Marine Notice 044-2016 : Bathymetric Survey – Chartered Least Depth Amendment

Download

Port Marine Notice 045-2016 : New Buoy Deployed-East Ghasha –JD/Ruwais Port

Download

Port Marine Notice 046-2016 : Re Deploy Tug Mooring Buoy

Download

YEAR: 2015

Port Marine Notice 004-2015 : Carbon black & delayed coker project

Download

Port Marine Notice 008-2015 : Installation of two buoys at GASCO SHT

Download

YEAR: 2013

Port Marine Notice 008-2013 : Lost anchors - obstruction

Download