Jebel Dhanna Ruwais Port

YEAR: 2018

Port Marine Notice 024-2018:ADNOC Gas Processing (GASCO) - Upgrade of Berth 1, Extension of Berths 2 & 3 Fire Fighting System - Completed

Download

Port Marine Notice 023-2018BOROUGE 3 - Backfilling of trench with SWL pipelines, Launching Platform & Nav. Channel

Download

Port Marine Notice 022-2018: BOROUGE 3 - Sea Water Intake Pipeline Cleaning Project Complete

Download

Port Marine Notice 021-2018: Marine Ecology Survey and Sampling at RRW-Completed

Download

Port Marine Notice 020-2018: ADNOC Refining - CARBON BLACK & DELAYED COKER PROJECT - CBDC MARINE JETTY BALANCE WORK - Completed

Download

Port Marine Notice 019-2018: Lost Anchor - Retrieved

Download

Port Marine Notice 018-2018: Lost Anchor's - Obstruction

Download

Port Marine Notice 016-2018: Bathymetric Survey in Jebel Dhanna Ruwais Port Limits

Download

Port Marine Notice 013-2018: Bathymetric Survey at Outer Limits of Ruwais Port.

Download

Port Marine Notice 011-2018: Heavy lift Transiting from Yabr channel to GS jetty within RRW terminal.

Download

Port Marine Notice 010-2018: Navigational buoy it.

Download

Port Marine Notice 009-2018: RACON (C) is not working on Creagh Shoal buoy.

Download

Port Marine Notice 007-2018: Borouge channel Buoy B-10 Deployed back to chartered position.

Download

Port Marine Notice 001-2018: New offshore structures (Jacket complete with topsides)

Download

YEAR: 2017

Port Marine Notice 014-2017: Repositioning of Navigational Buoy No. 13 - Ruwais Channal.

Download

Port Marine Notice 013-2017: GD-E (PHASE-1) 42" Offshore Pipeline Project - Installation of KP 38 deck using HLS-2000 Barge.

Download

Port Marine Notice 012-2017: IGD-E (PHASE-1) 42" Offshore Pipeline Project - Installation of KP 38 deck using HLS-2000 Barge.

Download

Port Marine Notice 011-2017: Bathymetric Survey of Routes, Channels, Anchorages and Basins within and leading to Petroleum ports

Download

Port Marine Notice 010-2017: Repositioning of Navigational Buoys YAS-1 and YAS-2

Download

Port Marine Notice 008-2017: Bathymetric survey at Ruwais/ Yas / E Ghasha and Delma Band

Download

Port Marine Notice 006-2017: Revamped Port Regulations and Information Booklet

Download

Port Marine Notice 003-2017: Pipe laying Operation - IGD-E-42” offshore pipeline from Das Island to Ras Al Qil

Download

Port Marine Notice 002-2017: Channel Status- Jebel Dhanna Ruwais

Download

YEAR: 2016

Port Marine Notice 012-2016: WRECK located on seabed

Download

Port Marine Notice 030-2016 : Alternative Recommended Dalma Route

Download

Port Marine Notice 033-2016 : Commissioning of Ruwais LNG Terminal

Download

Port Marine Notice 037-2016 : Bulk Cargo Terminal (BCT) Channel Buoys change of light characteristics

Download

Port Marine Notice 041-2016 : CGG 3D SEISMIC SURVEY. Phase I - Completed & Phase II - Commenced

Download

Port Marine Notice 044-2016 : Bathymetric Survey – Chartered Least Depth Amendment

Download

Port Marine Notice 045-2016 : New Buoy Deployed-East Ghasha –JD/Ruwais Port

Download

Port Marine Notice 046-2016 : Re Deploy Tug Mooring Buoy

Download

YEAR: 2015

Port Marine Notice 004-2015 : Carbon black & delayed coker project

Download

Port Marine Notice 008-2015 : Installation of two buoys at GASCO SHT

Download

YEAR: 2013

Port Marine Notice 008-2013 : Lost anchors - obstruction

Download